PlasmaNodes Hosting - Notice history

Major outage

Main Website - Operational

Client Area - Major outage

VPS Control Panel - Major outage

Game Server Control Panel - Major outage

Major outage

B-MIA01 - Major outage

94.88% uptime
Mar 2024
Apr 2024
May 2024

G-MIA01 - Operational

94.49% uptime
Mar 2024
Apr 2024
May 2024
Major outage

GS-MIA01 - Major outage

94.56% uptime
Mar 2024
Apr 2024
May 2024

GS-MIA02 - Operational

94.82% uptime
Mar 2024
Apr 2024
May 2024

Notice history

View current status

May 2024

Mar 2024

MAR25
GTT Maintenance at Path.net Miami PoP
CompletedMaintenance4 hours 30 minutes
  • Completed25/03/2024 at 2:20 PMUTC
    Maintenance has completed successfully
  • In progress25/03/2024 at 9:50 AMUTC
    Maintenance is now in progress
  • Planned25/03/2024 at 9:50 AMUTC

    GTT has scheduled maintenance for the Path.net Miami Point of Presence (PoP). Throughout this maintenance, we will carefully monitor the PoP to assess the feasibility of rerouting traffic and minimising any potential impact. While the maintenance is underway, the traffic will be automatically redirected to another carrier, but we expect brief interruptions during this period.

Finish migratrion progress
Resolved841 hours 53 minutes
  • ResolvedUTC

    The maintenance was finished, all services was assigned on the new control panel

  • IdentifiedUTC

    We're starting Ryzen services maintenance. Services will maintain offline during this process.

  • UpdateUTC

    This maintenance will be a major downtime of 2-5 hours, we will begin a migration process of all Ryzen services to our new Virtfusion Control Panel, this process will begin on April 26, 2024 at 17:00 UTC. This process will take from 2 up to 5 hours, since we have to do a previous backup of all VPS to ensure data redundancy before doing this migration.

  • UpdateUTC

    We've implemented the new upstream network, we're monitoring to detect any inestability.

  • UpdateUTC

    Please note there may be degraded performance in regards to internet till we receive our FL-IX cross-connect.

  • MonitoringUTC

    All is up now. We'll monitoring during 72 hours to check if its doesnt exist any anomalies

  • UpdateUTC

    We have received access to the switch. Maintenance will be underway soon.

  • UpdateUTC

    Our upstream were unable to complete the maintenance required to set up Miami today. We will ensure that services in Miami are restored around Wednesday, March 27, 2024 13:00 UTC

  • UpdateUTC

    Datacenter was not able to provide a KVM to remotely access the switches as another client was using it, They will complete it in the morning.

  • UpdateUTC

    Installation complete, Awaiting the power drop and internet drop from the datacenter.

  • UpdateUTC

    The tech is on-site, installing all the stuff.

  • IdentifiedUTC

    We are currently experiencing problems with our upsteam, which affects all our services. The downtime is due to the fact that they are moving the servers to another cabinet. According to our upstream, the incident will be resolved on Monday 25/03/2024.