Mar 2024

GTT Maintenance at Path.net Miami PoP
  • Completed
    25/03/2024 at 2:20 PM
    Completed
    25/03/2024 at 2:20 PM
    Maintenance has completed successfully
  • In progress
    25/03/2024 at 9:50 AM
    In progress
    25/03/2024 at 9:50 AM
    Maintenance is now in progress
  • Planned
    25/03/2024 at 9:50 AM
    Planned
    25/03/2024 at 9:50 AM

    GTT has scheduled maintenance for the Path.net Miami Point of Presence (PoP). Throughout this maintenance, we will carefully monitor the PoP to assess the feasibility of rerouting traffic and minimising any potential impact. While the maintenance is underway, the traffic will be automatically redirected to another carrier, but we expect brief interruptions during this period.

Finish migratrion progress
  • Resolved
    Resolved

    The maintenance was finished, all services was assigned on the new control panel

  • Identified
    Identified

    We're starting Ryzen services maintenance. Services will maintain offline during this process.

  • Monitoring
    Update

    This maintenance will be a major downtime of 2-5 hours, we will begin a migration process of all Ryzen services to our new Virtfusion Control Panel, this process will begin on April 26, 2024 at 17:00 UTC. This process will take from 2 up to 5 hours, since we have to do a previous backup of all VPS to ensure data redundancy before doing this migration.

  • Monitoring
    Update

    We've implemented the new upstream network, we're monitoring to detect any inestability.

  • Monitoring
    Update

    Please note there may be degraded performance in regards to internet till we receive our FL-IX cross-connect.

  • Monitoring
    Monitoring

    All is up now. We'll monitoring during 72 hours to check if its doesnt exist any anomalies

  • Identified
    Update

    We have received access to the switch. Maintenance will be underway soon.

  • Identified
    Update

    Our upstream were unable to complete the maintenance required to set up Miami today. We will ensure that services in Miami are restored around Wednesday, March 27, 2024 13:00 UTC

  • Identified
    Update

    Datacenter was not able to provide a KVM to remotely access the switches as another client was using it, They will complete it in the morning.

  • Identified
    Update

    Installation complete, Awaiting the power drop and internet drop from the datacenter.

  • Identified
    Update

    The tech is on-site, installing all the stuff.

  • Identified
    Identified

    We are currently experiencing problems with our upsteam, which affects all our services. The downtime is due to the fact that they are moving the servers to another cabinet. According to our upstream, the incident will be resolved on Monday 25/03/2024.

Feb 2024

No notices reported this month

Jan 2024

No notices reported this month

Jan 2024 to Mar 2024